1
1. Schedule of Delivery Period؛r(sh)gű
2. Schedule of Documentation Submitted With Bid(Ͷ(bio)ļfһ[)
3. Schedule of Drawing Submitted with Bid(Ͷ(bio)D?zh)ύһ[)
4. Schedule of Guaranteed Characteristics((dn)һ[)
5. Schedule of Origin of goods(؛Դһ[)
6. Schedule of Deviation from Technical Specification(g(sh)Ҏ(gu)ƫһ[)
7. Schedule of Discounts(ۿһ[)
8. Schedule of port of loading and details of consignment(bdۿں\(yn)(x)(ji)һ[)
2
The contracted goods should be delivered
3
PLEASE NOTE: Failure to submit complete schedules of the BID is considered as non-responsive and will result in disqualification of the offer without further request for submission of such schedules.[Ո(qng)ע⣺܉ȫṩ(bio)еģ؛Ӌ(j)ҕ鲻ܑ(yng)(bio)ʧȥ(bo)r(ji)Y](mi)M(jn)һύՈ(qng)]
4
5